Velux to Dormer Conversions in West Sussex
Our teams install velux to dormer conversions throughout West Sussex, handling structure, weatherproofing, glazing and finish as one job with one point of contact.
Velux to Dormer Conversions — indicative geometry
Velux to Dormer Conversions for West Sussex homes
West Sussex is a mix of Victorian and Edwardian terraces, interwar semi-detached houses and post-war bungalows, and each of those wants a different dormer form — which is why we survey before quoting rather than pricing off a photograph.
Plenty of lofts were converted in the 1990s and 2000s with rooflights only, leaving a room with sloping ceilings you cannot put a wardrobe against. Cutting a dormer into an already-converted loft is a shorter job than starting from scratch — the floor, stair and services are already there — but it does need the existing structure checking before anything is opened up.
Key specification
| Typical gain | 3m² – 8m² of full-height floor |
|---|---|
| Prerequisite | Existing floor structure verified |
| Disruption | Room out of use 3–5 weeks |
| Roof finish | GRP, EPDM or tile to suit |
Planning and building control in West Sussex
We run the permitted development test on your specific property: set-back from the eaves, height against the ridge, volume allowance and whether an Article 4 direction applies locally.
Building regulations approval is separate and always required. We submit the application, book the inspections around the programme and hand you the completion certificate at the end — the document a buyer's surveyor will ask to see.
Why homeowners in West Sussex use us
We only do dormers. That sounds like a limitation until you have watched a general builder improvise a back gutter on a wet Thursday.
If you want to know what your roof will actually take, the survey is free and there is no obligation attached to it.
Other dormer work in West Sussex
FAQs
Velux to Dormer Conversions in West Sussex — FAQs
How long does a dormer take to build?
A single box or flat roof dormer is typically three to five weeks on site. A full-width rear dormer runs five to eight weeks, and an L-shaped dormer on a terrace with an outrigger is closer to seven to ten. A complete dormer loft conversion including the staircase, services and finishes is usually eight to twelve weeks from scaffold up to sign-off.
Can you build a dormer on a bungalow?
Usually yes, and bungalows often give the best results because the spans are wide and there are no party walls. The deciding factor is ridge height: you generally want at least 2.6m from the top of the ceiling joists to the underside of the ridge. We measure this at survey before committing to anything.
Can I put a dormer on the front of my house?
Front-facing dormers are not covered by permitted development and always need a full planning application. Approval depends heavily on the street scene — planners look at whether other dormers already exist on the road, and at proportion, position and materials. Hipped and pitched forms are approved far more often than flat boxes on a front elevation.
Do you handle the planning application?
Yes. We prepare measured drawings, elevations and sections, submit the application or the lawful development certificate, and deal with the case officer's queries. On conservation and listed work we also put together the heritage justification the application needs.
What is the difference between a dormer and a Velux?
A rooflight sits flush in the roof slope and gives you light without any extra height — you still have a sloping ceiling. A dormer projects out from the roof and creates vertical walls with a level ceiling behind them, so you gain genuinely usable standing space and floor area, not just daylight.
Find out what your roof will take
A free measured survey in West Sussex tells you what is achievable, what it needs, and what it costs — before you commit to anything.