Skip to content

Dormer Cladding

Re-clad tired dormer cheeks and faces in tile, lead, zinc, timber or GRP. Transforms the look of a roof for a fraction of a rebuild.

Free measured surveyA specialist visits, measures and tells you what the roof will and will not take.
Fixed written priceOne quotation covering structure, scaffold, weatherproofing, glazing and making good.
Building control managedWe submit, book the inspections and hand you the completion certificate.
Insured and guaranteed£5m public liability, ten-year structural and twenty-year flat roofing guarantees.
Nationwide coverageDirectly employed and vetted specialist teams across England, Wales, Scotland and Northern Ireland.

Dormer Cladding — indicative geometry

What a dormer cladding actually is

Dormer cheeks take driving rain on a vertical face with no overhang, which is why they are usually the first thing to fail. Re-cladding strips back to the sheathing, checks and replaces any soft timber, adds a fresh breather membrane and battens, and re-covers in your chosen finish. The structure stays; the appearance and the weather resistance are new.

Specification at a glance

FinishesPlain tile-hung, slate-hung, lead, zinc, cedar, GRP
Build-upSheathing, breather membrane, battens, finish
Timber checkAll studs and noggins probed and replaced as needed
InsulationUpgrade to 0.18 W/m²K available
AccessScaffold or tower
Typical duration4–8 days per dormer
Indicative guide prices. Our online tool gives a realistic range in about a minute — pick your dormer type, width, finish and scope. Get an indicative price →

How we build it

We would rather tell you at survey that your ridge height will not take what you want than take a deposit and find out in week three. Every dormer cladding job runs the same seven stages — survey and feasibility, design and consent, scaffold and protection, structure, weatherproofing, glazing, then finish and sign-off.

Rear dormers on houses often sit inside permitted development, but the volume allowance is consumed by any previous loft or rear extension — so we check the planning history for the address before we say yes.

What is included in the price

  • Measured survey, structural calculations and full working drawings
  • Planning application or lawful development certificate, and the building regulations application
  • Scaffold design, erection, weekly inspection, hire and dismantling
  • All structure, weatherproofing, flashings, gutters and cladding
  • Glazing with escape-compliant opening lights where required
  • Building control inspections and your completion certificate
  • Waste removal and making good

Where this goes wrong elsewhere

The two failures we are called to fix most often on dormer cladding are undersized or incorrectly lapped flashings, and a vapour control layer that stops at the first awkward junction. Neither shows up for a winter or two. Both are cheap to do properly at build stage and expensive to correct afterwards.

Send us the address and roughly what you are hoping to gain, and we will come back with a realistic answer rather than an optimistic one.

Related work

Dormer Cladding by county

Where we do this work

Specialist teams across 74 counties. Pick your area for local detail, or browse every town.

How a dormer gets built

Seven stages, in this order, every time

The sequence matters. Most dormer problems come from doing one of these out of order — glazing before the flashings, or opening the roof before the materials land.

01

Survey and feasibility

A specialist measures the roof, checks ridge height, span and structure, and confirms whether you are inside permitted development.

02

Design and consent

Measured drawings, elevations and sections. We submit the planning application or lawful development certificate and the building regulations application.

03

Scaffold and protection

Scaffold designed, erected and inspected. Temporary weather protection over the work area before anything is opened.

04

Structure

Ridge beam and floor steels craned or manhandled in, new joists laid, the dormer frame built and sheathed.

05

Weatherproofing

Deck, insulation, membrane or lead, cheek cladding, flashings and gutters — the dormer is weathertight from this point.

06

Glazing

Windows fitted square, sealed and drained, with escape-compliant opening lights where required.

07

Finish and sign-off

Plaster, electrics, decoration and making good, final building control inspection and your completion certificate.

FAQs

Dormer Cladding — your questions

Can you build a dormer in winter?

Yes, with adjustments. Temporary weather protection over the scaffold lets structural work continue in most conditions. GRP roofing needs dry conditions above about 5°C to cure properly, so in a cold spell we either sequence it differently or specify EPDM, which is unaffected.

Do I need planning permission for a dormer window?

Rear dormers on a house often fall under permitted development, provided the dormer is set at least 200mm back from the eaves, sits below the ridge line, uses materials similar in appearance to the existing house, and stays within the volume allowance — 40m³ for a terrace, 50m³ for a semi or detached. Front-facing dormers, flats and maisonettes, listed buildings, conservation areas and any property with an Article 4 direction all need a full planning application. We check the constraints on your specific address before we quote.

How long does a dormer take to build?

A single box or flat roof dormer is typically three to five weeks on site. A full-width rear dormer runs five to eight weeks, and an L-shaped dormer on a terrace with an outrigger is closer to seven to ten. A complete dormer loft conversion including the staircase, services and finishes is usually eight to twelve weeks from scaffold up to sign-off.

Does a dormer need building regulations approval?

Yes, always — permitted development covers planning, not building control. A dormer needs approval for structure, thermal performance under Part L, fire escape and protected route under Part B, and stairs under Part K if a staircase is involved. We handle the application, the inspections and the completion certificate.

What is the best roof covering for a flat dormer?

GRP fibreglass and EPDM rubber are the two we specify most. GRP cures into a single seamless laminate with bonded trims and suits small tops with several upstands. EPDM is a one-piece membrane that copes better with movement on larger spans. Both carry twenty-year guarantees; mineral felt is cheaper but has a materially shorter life.

Can I put a dormer on the front of my house?

Front-facing dormers are not covered by permitted development and always need a full planning application. Approval depends heavily on the street scene — planners look at whether other dormers already exist on the road, and at proportion, position and materials. Hipped and pitched forms are approved far more often than flat boxes on a front elevation.

Will a dormer add value to my house?

A properly built and signed-off dormer conversion adding a bedroom and bathroom typically returns a meaningful share of its cost in value, and more in areas where floor space is scarce. The building control completion certificate is what makes the space count as habitable floor area on a valuation — without it, surveyors will not include it.

Read all frequently asked questions →

Find out what your roof will take

A free measured survey tells you what is achievable, what it needs, and what it costs — before you commit to anything.

Message us on WhatsApp
Call WhatsApp Get a quote