Skip to content

Sash Dormer Windows in Kent

We design, build and weatherproof sash dormer windows for homeowners across Kent, working from first survey through to building control sign-off.

Free measured surveyA specialist visits, measures and tells you what the roof will and will not take.
Fixed written priceOne quotation covering structure, scaffold, weatherproofing, glazing and making good.
Building control managedWe submit, book the inspections and hand you the completion certificate.
Insured and guaranteed£5m public liability, ten-year structural and twenty-year flat roofing guarantees.
Nationwide coverageDirectly employed and vetted specialist teams across England, Wales, Scotland and Northern Ireland.

Sash Dormer Windows — indicative geometry

Sash Dormer Windows for Kent homes

Kent is a mix of Victorian and Edwardian villas, weatherboarded cottages and large 1930s semi-detached estates, and each of those wants a different dormer form — which is why we survey before quoting rather than pricing off a photograph.

Dormers on Victorian and Georgian houses were sashes, and a casement in the same hole reads wrong from the pavement immediately. Spiral-balance or traditional cord-and-weight sashes are both available at dormer sizes, in timber or in slim heritage uPVC with run-through horns and putty-line profiles.

Key specification

OperationSpiral balance or cord and weight
MaterialsTimber or heritage uPVC
DetailingRun-through horns, putty-line, astragal bars
GlazingSlim heritage units, 12–14mm
Indicative guide prices. Our online tool gives a realistic range in about a minute — pick your dormer type, width, finish and scope. Get an indicative price →

Planning and building control in Kent

We run the permitted development test on your specific property: set-back from the eaves, height against the ridge, volume allowance and whether an Article 4 direction applies locally.

Building regulations approval is separate and always required. We submit the application, book the inspections around the programme and hand you the completion certificate at the end — the document a buyer's surveyor will ask to see.

Why homeowners in Kent use us

We only do dormers. That sounds like a limitation until you have watched a general builder improvise a back gutter on a wet Thursday.

If you want to know what your roof will actually take, the survey is free and there is no obligation attached to it.

Other dormer work in Kent

FAQs

Sash Dormer Windows in Kent — FAQs

What is the best roof covering for a flat dormer?

GRP fibreglass and EPDM rubber are the two we specify most. GRP cures into a single seamless laminate with bonded trims and suits small tops with several upstands. EPDM is a one-piece membrane that copes better with movement on larger spans. Both carry twenty-year guarantees; mineral felt is cheaper but has a materially shorter life.

What insulation do dormers need?

Current building regulations want around 0.15–0.18 W/m²K for a new dormer roof and 0.18 W/m²K for the cheeks and front. In practice that is a warm-roof build-up using 100–150mm of PIR insulation above or between the structure, with a continuous vapour control layer on the warm side. Getting the VCL continuous matters more than the insulation thickness.

Can you match my existing roof tiles?

Usually. Most common clay and concrete profiles are still in production or available reclaimed, and we source a match at survey stage so you see it before work starts. Where a discontinued profile cannot be matched exactly, we normally recommend taking tiles from a less visible slope for the dormer and using the closest new match on the hidden elevation.

Can you convert an existing Velux loft to a dormer?

Yes, and it is usually a shorter job than starting from scratch because the floor, staircase and services already exist. We verify the existing floor structure and any previous building control approval first, then cut and form the dormer into the finished room. Expect the room to be out of use for three to five weeks.

How disruptive is a dormer build?

Less than people expect, because most of the work happens above your ceilings and is reached from the scaffold. The noisy phases are opening up and installing steels, typically two to four days. Once the staircase is cut in there is dust and traffic through the house, and we sheet and protect the route for that period.

Read all frequently asked questions →

Find out what your roof will take

A free measured survey in Kent tells you what is achievable, what it needs, and what it costs — before you commit to anything.

Message us on WhatsApp
Call WhatsApp Get a quote