Skip to content

Lead & Zinc Dormer Roofing in Surrey

We design, build and weatherproof lead & zinc dormer roofing for homeowners across Surrey, working from first survey through to building control sign-off.

Free measured surveyA specialist visits, measures and tells you what the roof will and will not take.
Fixed written priceOne quotation covering structure, scaffold, weatherproofing, glazing and making good.
Building control managedWe submit, book the inspections and hand you the completion certificate.
Insured and guaranteed£5m public liability, ten-year structural and twenty-year flat roofing guarantees.
Nationwide coverageDirectly employed and vetted specialist teams across England, Wales, Scotland and Northern Ireland.

Lead & Zinc Dormer Roofing — indicative geometry

Lead & Zinc Dormer Roofing for Surrey homes

Most of the dormer work we take on around Surrey is on large interwar detached and semi-detached houses with generous roof spans, where the ridge height and the position of the existing purlins set the limits.

Lead fails from thermal movement, not from age — which means bay sizes, code thickness and fixing centres decide whether a dormer roof lasts thirty years or three. We work to Lead Sheet Association guidance on every detail: welted bays, correct laps, chase depths and clip spacing. Standing-seam zinc gives a similar lifespan with a lighter, more contemporary line.

Key specification

Lead codesCode 4, 5 and 6 to LSA guidance
Bay sizesSized to code and orientation
ZincStanding seam, natural or pre-weathered
SubstrateVentilated deck with separation layer
Indicative guide prices. Our online tool gives a realistic range in about a minute — pick your dormer type, width, finish and scope. Get an indicative price →

Planning and building control in Surrey

Rear dormers on houses often sit inside permitted development, but the volume allowance is consumed by any previous loft or rear extension — so we check the planning history for the address before we say yes.

Building regulations approval is separate and always required. We submit the application, book the inspections around the programme and hand you the completion certificate at the end — the document a buyer's surveyor will ask to see.

Why homeowners in Surrey use us

We would rather tell you at survey that your ridge height will not take what you want than take a deposit and find out in week three.

If you want to know what your roof will actually take, the survey is free and there is no obligation attached to it.

Other dormer work in Surrey

FAQs

Lead & Zinc Dormer Roofing in Surrey — FAQs

How disruptive is a dormer build?

Less than people expect, because most of the work happens above your ceilings and is reached from the scaffold. The noisy phases are opening up and installing steels, typically two to four days. Once the staircase is cut in there is dust and traffic through the house, and we sheet and protect the route for that period.

Do dormer windows need to be fire escape windows?

In a loft conversion, at least one window in each habitable room generally needs to meet escape requirements — a clear opening of at least 0.33m², minimum 450mm in both height and width, with the bottom of the opening between 800mm and 1100mm above floor level. We specify the opening lights to meet this as standard.

Do I need planning permission for a dormer window?

Rear dormers on a house often fall under permitted development, provided the dormer is set at least 200mm back from the eaves, sits below the ridge line, uses materials similar in appearance to the existing house, and stays within the volume allowance — 40m³ for a terrace, 50m³ for a semi or detached. Front-facing dormers, flats and maisonettes, listed buildings, conservation areas and any property with an Article 4 direction all need a full planning application. We check the constraints on your specific address before we quote.

Will my roof be open to the weather?

No. The roof is only opened once the scaffold, temporary weather protection and materials are all on site, and the dormer is made weathertight — structure, deck, membrane and temporary glazing — before the crew leaves at the end of the opening-up phase. We do not open a roof on a Friday afternoon.

What is the best roof covering for a flat dormer?

GRP fibreglass and EPDM rubber are the two we specify most. GRP cures into a single seamless laminate with bonded trims and suits small tops with several upstands. EPDM is a one-piece membrane that copes better with movement on larger spans. Both carry twenty-year guarantees; mineral felt is cheaper but has a materially shorter life.

Read all frequently asked questions →

Find out what your roof will take

A free measured survey in Surrey tells you what is achievable, what it needs, and what it costs — before you commit to anything.

Message us on WhatsApp
Call WhatsApp Get a quote